Stein EPR 300mm Pruner Rope Isolator Bar
Stein EPR 300mm Pruner Rope Isolator Bar
The Stein EPR 300mm Pruner Rope Isolator Bar is a professional insulated component designed for use with Stein Utility EPR pruning systems. Installed between the rope and the pruning tool head, it provides a dedicated insulated section that supports safer pruning operations when working near electrical infrastructure.
Designed to integrate directly into compatible EPR pruning systems, the isolator bar increases separation at a critical connection point without affecting normal rope operation. Its lightweight construction helps maintain smooth rope movement and consistent handling during both ground-based and elevated pruning tasks.
Built for regular professional use, the 300 mm isolator bar offers a durable solution that works seamlessly with compatible Stein Utility EPR pruning heads, helping maintain system performance while supporting established safe working practices.
Key Features
- Professional insulated pruner rope isolator bar
- Provides a dedicated insulated section between rope and tool head
- Designed for use with Stein Utility EPR pruning systems
- 300 mm insulation length
- Lightweight construction maintains smooth rope handling
- Direct-fit installation without modifying the existing system
- Supports controlled pruning near electrical infrastructure
- Durable construction for regular professional use
Specifications
- Brand: Stein
- Product Type: Pruner rope isolator bar
- Insulation Length: 300 mm
- Compatibility: Stein Utility EPR pruning heads
- Installation: Direct fit between rope and tool head connection
Why Choose the Stein EPR 300mm Pruner Rope Isolator Bar?
✅ Adds a dedicated insulated section within the pruning system
✅ Integrates directly into compatible Stein Utility EPR equipment
✅ Lightweight design maintains natural rope movement and handling
✅ Built for dependable performance during professional pruning work
How to Use
- Inspect the isolator bar to ensure it is clean, dry, and free from damage.
- Install it between the rope and compatible tool head at the designated connection point.
- Confirm all connections are correctly fitted and secure before use.
- Operate the pruning system using smooth, controlled movements.
- Clean, inspect, and remove the component from service if any damage is found.
Important Safety Information
Do not operate near overhead power lines or electrical power sources unless fully trained and experienced in the use of insulated fibreglass pole systems.
Size guide
TEst Test
1. measure from left to right
2. test
3. TESST
Sizes
| Row | Length |
|---|---|
| S | 10cm |
| M | 20cm |
| L | 30cm |
Sizes
| Row | Length |
|---|---|
| S | 10cm |
| M | 20cm |
| L | 30cm |



